2.1-million square foot manufacturing facility completed in only 12 months
At a glance
Company:
Industry:
Service:
HVAC and Plumbing, Concrete, Electrical, Equipment Setting / Rigging, Mechanical, Civil / Sitework, Masonry
First Solar selected Rudolph Libbe Inc. in April 2021 as the design-builder of a 2.1-million-square foot manufacturing facility in Lake Township, Ohio, on the strength of its success in building a facility for the client in 2019. Rudolph Libbe was asked to accelerate the schedule on the new facility (internal name PGT-03) and meet a 12-month duration to turn over the site for equipment setting. This project – nearly double the size and production capacity of the 2019 project – was also built while the COVID-19 epidemic was negatively affecting supply chain capacity.
Rudolph Libbe met the challenge: The new facility now produces First Solar’s advanced technology Series 6 thin film photovoltaic (PV) module and increased its U.S. capacity by 100% while adding 450 jobs.
Rudolph Libbe Group trades workers worked the majority of the nearly 750,000 man-hours on the project. Rudolph Libbe Inc. self-performed sitework, site concrete, site utilities, building foundations, concrete slabs and masonry. GEM Inc., another °®À¤×ÊÔ´ company, performed building plumbing, HVAC, building electrical, central utility building electrical, process mechanical and substation electrical work, and equipment setting.
Rudolph Libbe Properties, another °®À¤×ÊÔ´ company, used ³§¾±³Ù±ð³¢¾±²Ô±ðâ„¢, its proprietary property services program, to negotiate incentives with state and local government bodies, including funding for road improvements and utility extensions to the 250-acre site.
This project utilized off site pre-fabrication of many of the mechanical components to facilitate the accelerated schedule. The COVID-19 pandemic presented many challenges on how Rudolph Libbe would acquire its materials and equipment. Substitute materials and mock-ups of equipment were used to meet the fast-track schedule. Safety was planned into every aspect of the project.
The success of this project convinced First Solar to use Rudolph Libbe as design-builder for three more large manufacturing facility projects, one in Ohio, another in Alabama and a third in Louisiana.